Dear Experts,
'Requirement Quantity Indicator' is wrongly determined in slotting run for a product.
We have Assigned Intervals to Requirement Indicators.
for ex: if 'Maximum Requirement Value = 100, then requirement Quantity Indicator = SLOW
and if 'Maximum Requirement Value = 1000, then requirement Quantity Indicator = FAST etc.
Demand Qty = 1000 is maintained in the Warehouse /Product under slotting TAB.
Irrespective of the demand qty maintained in product master, during the slotting, system always determines the first requirement Quantity Indicator = SLOW which is the first maintained entry in the sequence.
How we can connect Demand Qty to requirement Quantity Indicator so that appropriate requirement Quantity Indicator is determined.
We need this to configure the determination of appropriate PACI.
Appreciate your inputs on this.
Regards,
shashidhar